Preparatory stage for installing a suspended ceiling

Installation of the suspended ceiling begins after the completion of all construction work. At the preparatory stage, the room is cleaned of construction debris, openings in the walls are closed and heating is turned on. The installation of a suspended ceiling can be performed together. The main thing is to prepare all the necessary tools. For suspensions, use thin wire, which is cut with special scissors.

Such scissors have a spring, thanks to which after the cut of the blades they move apart themselves. This greatly facilitates the work with the wire. To increase the accuracy and accelerate the marking of places of fastening of suspensions and profiles, an elastic thread with coloring elements is used. Round holes and narrow stripes are cut out using a saw that has a narrow canvas 250 mm long. With the help of pliers, make a bend of wire suspensions and twist the wire.

Installation work begins by studying the premises plan. According to the drawings, the installers calculate the required amount of materials. They use a working cart, which has two levels of workplace. For fastening suspensions, the worker selects a higher position on the cart. In a low position, it is more convenient to install the frame and facial elements.